MOULDKING Building Block 16031 (Xiaocheng Barbershop) Review

Hello, everyone, today [virtual evaluation] Ustar MOULDKING Building Block 16031 (Xiaocheng Barbershop) brought by the Fatty Editor today

Basic Information

Everyone should pay attention to many original works of Yuxing.

Today I brought this barber shop with a bold color scheme.

Of course, the Phantasialand series, antique shop, and the design styles are from the same designer at a glance. A lot of support for domestic original works, everyone can be more tolerant and support for domestic production, so that more good works can appear.

Box photo

building blocks731

Introduce the details behind, plus other to advise buy pictures.

building blocks732

Finished product size: 26*26*35, unit cm

640.webp 2 3

One of the best domestic brands, buy with confidence.

sembo block732

In the gift set, the breath-changing light is not shown here.

shandong ship730

Contents

There is no inner box, there is a small carton in the middle of the box, there is nothing inside, it is only used to support the outer box, strengthen the hardness, so that the express is not so easy to throw away, praise.

sembo block733

With 7 building blocks, this sealed bag can be left, which is very versatile.

sembo block729

Instructions, steps are sub-contracted.

shandong ship733

Gift lighting group.

senbao building blocks733

In order to prevent everyone from missing the connection, so put the connection.

senbao building blocks2

[High brick] No. 1200, the flattest domestic base plate.

building blocks733

Since there is no printed part, it can only be replaced by a sticker, which is very good quality.

senbao building blocks732

Most of them use [high brick] parts!

shandong ship734

Some parts are not high brick parts

senbao building blocks735

Assembling process

I started to fight, because there is a light circuit, when everyone presses or hammers, the attention is paid. Lamppost in package 3

sembo block734

Both light lines require attention.

sembo block735

The building on the right is a barber shop

building blocks734

This shampoo chair is very restorative. Many skills can be learned (such as: snot’s sofa).

senbao building blocks734

Modular, not bad.

shandong ship732

Remember, when you have time, you should test the light set. Because I don’t know if a certain brick will be forced to break.

shandong ship735

Why is the design of this cabinet and why can’t it give 2 more drawers.

shandong ship736

Is the tool room on the left or a repair shop?

building blocks736

The color scheme is very bold!

senbao building blocks736

The first floor is basically completed

sembo block737

The physical feeling of the back stairs is so thick.

building blocks737

Very realistic, this is the author’s style.

building blocks735

After finishing the package No. 3, there is a lot of nets, but they will be used later, so everyone finishes the spelling, and the extras are left first, and don’t throw them away.

sembo block736

The description of the 2-layer bottom plate must be carefully read. Because of the angle, it is easy to make mistakes. When the bottom plate is reinforced, it must be correct.

shandong ship737

The very rare lemon yellow is used on the 2nd layer!

sembo block738

211 steps, one small step inside, and 1×3 1×1 bricks below, don’t misspell it, or you will think it’s missing pieces afterwards.

building blocks738

The second floor is for expensive items such as bbq.

shandong ship738

279 steps, the instructions are not clear, in fact, it is 263 steps and 278 steps.

senbao building blocks739

Step 285, it is recommended to put together the flowers below. Put on the window sill again. There should be a problem with the order in the instructions.

senbao building blocks737

When it’s almost finished, let everyone put together the light lines. It is recommended that you put together the blue building on the left before sticking it.

shandong ship739

There are no 3 layers, so 2 layers are capped.

building blocks740

The blue 2nd floor should be the manager’s room, but there is no staircase up. You can only come through the project on the right

senbao building blocks738

The author likes to make windows in this way of colored glaze most.

senbao building blocks740

The 2nd floor is almost complete. The color scheme is very bold

building blocks741

A lot of green plants live on the roof. You can also play with it. The instructions here do not carefully indicate the location of the bricks. Do not stand up parts against the wall.

sembo block741

Can be opened and closed

sembo block8

Xiaobian’s favorite letter combination is very three-dimensional.

sembo block739

The left side is directly capped.

building blocks742

The main body is completed.

building blocks739

finished

Finished product display

360-degree display of finished products

shandong ship741shandong ship740sembo block742sembo block740sembo block743shandong ship742senbao building blocks741senbao building blocks742senbao building blocks743

detail

The signboard makes the work look less short

building blocks743

The red telephone hall has no way.

shandong ship743

These golden decorative pieces are not from [High Brick]

sembo block744

Authors often use hoses to express arcs

building blocks745

Unexpectedly, even if the lighting set is installed this time, it can be played in layers.

senbao building blocks744

In this two-story manager room, there is no lighting group installed, which wastes the bonus points of the glazed window.

building blocks744

The flatness is still okay.

building blocks746

The completed picture of the built-in lighting group is like this. There is no light in front, and the glazed window on the left is not light.

shandong ship745

Very special breathing light!

sembo block7

I don’t like it, so I change it (additional light cords need to be purchased separately)

shandong ship747

The front end is also not light, it seems that it is not very successful. Let’s change it this way in the end.

shandong ship746

First summarize the need to pay attention to the situation:

Lamppost in package 3

211 steps, one small step inside, and 1×3 1×1 bricks below, don’t misspell it, or you will think it’s missing pieces afterwards.

279 steps, the instructions are not clear, in fact, it is 263 steps and 278 steps.

Step 285, it is recommended to put together the flowers below. Put on the window sill again. There should be a problem with the order in the instructions.

advantage

The original works, skills and design are very good. The colors are bold, with warm and cold echoes.

I have talked with the author, the author should belong to the [reality reduction school], which is to restore the entity as much as possible through the construction skills, very personal style, praise!

shortcoming

There are a few minor issues in the manual, and it’s okay to adjust the order.

Personally, I feel that the breathing light does not change color a lot. After the color changes, it feels like a haunted house series.

Smaller buildings may be very obvious throughout the town.

Color matching style will be easier to cause 2 polarization.

Suggest

Likes/dislikes are worth buying!!

mybuildingtoys
We will be happy to hear your thoughts

      Leave a reply

      Building Toys
      Logo
      Compare items
      • Total (0)
      Compare
      0
      Shopping cart